Project score
Connectivity score
Location score
Investment score
Launch Price : Rs. 7500 sq ft
Possession : Ready to move in
Total Land Area : 7.23 Acres
Number of Units : 422units
Tower Details : 5 towers
Floor Details : 40floors
Project Approval : BBMP
Furnished? : Unfurnished
Sanction plan from: BBMP
Commencement Certificate (For under construction property):
Khata Certificate and Khata Extract:
Bangalore Electricity Supply Company (BESCOM):
Booking Clause: 10 Lakhs
Swimming Pool
Open Amphitheatre
Cricket Net
Children's Play Area
Basketball Court
Tennis
Club House
Banquet Hall
Cafeteria
Gymnasium
Sewage Treatment Plant
Rain Water Harvesting
StructureDoors: : Color display VDP at entrance door Main Door : European engineered flush shutters of walnut/teak/oak veneer finish Main door will have superior security door locks-Godrej/Yale Toilet Door : European engineered flush shutters laminate finish Other Internal Door : European engineered flush shutters laminate finish Balcony Door : European engineered flush shutters laminate finish |
WindowMain Door : European engineered door frames with architraves Internal Doors : European engineered door frames with architraves Toilet Doors : European engineered door frames with architraves |
Flooring GeneralMain Lobbies : 1200 X 800 glossy vitrified tiles with spacers Skirting in same tile(RMT) Staircases - Main entry level : 1200 X 800 glossy vitrified tiles with spacers Skirting in same tile(RMT) All other Staircases : 1200 X 800 glossy vitrified tiles with spacers Skirting in same tile(RMT) |
FlooringIndividual Unit Foyer, Living & Dining : 1200 X 800 glossy vitrified tiles with spacers Skirting in same tile(RMT) Master Bedroom : Laminated wooden flooring Skirting, Trims, profiles (RMT) Kitchen : 1200 X 800 glossy vitrified tiles with spacers Skirting in same tile(RMT) All Bedrooms : 800 X 800 glossy double charged vitrified tiles with spacers Skirting in same tile(RMT) Balconies & Utility : Ceramic tiles flooring Toilets : Ceramic tiles flooring |
False CeilingFalse Ceiling will be prived in all the bathroom : Plastic emulsion on ceiling and walls op/gypsum punning on wall Attic or Storage or Utility : Tile dadoing upto parapet height Servants Toilets : Ceramic tiles Kitchen : 2′ dado above counter |
ToiletsWash basin -Master Bedroom : Roca/Kohler Wash basin -Other Bedroom : Roca/Kohler EWC's -Master Bedroom : Combination of tiles with imported/composite marble counters. Flooring in tiles EWC's -Other Bedrooms : Combination of tiles with imported/composite marble counters |
PaintingInternal Walls & Ceilings : Plastic emulsion paint External finish : Pop/gypsum punning |
Toilets: CP Fittings & AccessoriesChromium Plated Fittings : Grohe/Roca/Kohler Hot & Cold Water Mixer Shower Fittings : Shower enclosure |
Electrical Outline SpecificationModular Switches of reputed make : LEGRAND/SCHNIDER/CRABTREE/HONEYWELL/GM OR EQUIVALENT |
AC PointsMaster Bedroom All other bedrooms &Â |
TV PointsLiving Master Bedroom All other Bedrooms |
Telephone PointsLiving Master Bedroom All other Bedrooms |
Other Electrical pointsExhaust Fan point : In Kitchen and Toilets Water Purifier point : In Kitchen |